projects

Ching Fu Integrated Floating Dock

Image of Ching Fu Integrated Floating Dock

3500 tonnes floating dock

Ching Fu Integrated Floating Dock

3500 tonnes floating dock

For Ching Fu shipbuilding in Taiwan, a floating dock was designed by Vuyk Engineering Rotterdam to operate in unsupported areas. 

The dock is equipped with all required systems to operate it remotely, including accommodation for the operating crew and an integrated power generation system. The dock is developed as part of a modular design. The dock is equipped with all required systems to operate it remotely, including accommodation for the operating crew and an integrated power generation system. The dock is developed as part of a modular design.

Specifications

Launched in
2003
Length
101.00 m
Breadth
28.50 m
Net lifting capacity
3.500 tonnes
Lifting time at maximum capacity
< 1 hour

The dock is provided with a wastewater collecting system to protect the environment from pollution during docking operations. At Vuyk Engineering Rotterdam, we design with the future in mind so we can take care of the environment. This dock is developed as part of a modular design. In this range a dock up to 4500 tonnes is available.

Need to get in touch with the team?

We are all ears
VUYK engineering